Hello,
in the latest version of Dialux, all my plans (dwg, jpgs) are connected to every area of a project.
For example:
-I open an old project, and all the plans are checked off for every room. So when I view a bathroom on the first floor, I have to uncheck the plans for EG and UG. I have to do the same for every room and every floor.
-I insert a new plan into a project, and it is automatically checked off (and shows in) every room/floor/building of the project.
I am currently spending a lot of time unchecking plans, it would be great if this is fixed. I am also surprise that this has not been brought up already (is it just me??).
Viele Grüße
Lee